Stumm more work welches scheduled to complete the Elster-Saale canal. Such a move would allow small boats to reach the Elbe from Leipzig. The intended completion date has been postponed because of an unacceptable cost-benefit ratio. [51] This bombing was the largest up to that time. Due to the close https://kommunikationsagenturleip56678.wikijm.com/1123590/gerücht_buzz_auf_kommunikationsagentur_leipzig